Products > Yongbao New Tripolyphosphate Aluminum Anti rust Primer 1075
1.jpg
  • 1.jpg

Yongbao New Tripolyphosphate Aluminum Anti rust Primer 1075

# EPOXY ALUMINUM TRIPOLYPHOSPHATE PRIMER RAINBOW PAINTS ## Product Code No.1075 ## Type Two-component anti-rust primer formulated with epoxy resin, hardener and non-toxic aluminum tripolyphosphate anti-rust pigments. ## Application Eco-friendly anti-corrosion primer for steel fittings, external tank structures and factory steel equipment. ## Properties 1. Excellent fresh and seawater resistance 2. Releases powerful chelating tripolyphosphate ions for superior rust inhibition 3. Hard, flexible coating film with strong adhesion 4. Outstanding abrasion resistance 5. Excellent resistance to oil and chemical solvents ## Specification Data - Gloss: Flat - Color: Brown, Grey - Flash Point: Above 14°C (68°F) (mixed paint) - Specific Gravity: ≥1.4 kg/L (mixed paint) - Viscosity: 70~80 KU (25°C) - Drying Time - Surface dry: Within 2 hours (25°C) - Hard dry: Within 6 hours (25°C) - Full cure: 7 days (25°C) - Film Thickness: Wet film 100 μm, Dry film 40 μm - Theoretical Coverage: 10.0 m²/L, 13.2 m²/kg - Recoating Interval: Minimum 8 hours, Maximum 5 days (25°C) / 3 days (30°C) - Volume Solids: Over 50% (mixed paint, varies by shade) - Mix Ratio: As marked on bucket - Pot Life: 8 hours after mixing at 25°C - Thinner: No.1005 Rainbow Thinner - Thinner Dosage: 5~15% by weight (excluding tool cleaning) ## Compatible Primers No.908 Shop Primer (SP-01), No.1006 Epoxy Zinc Rich Primer, No.1011 Inorganic Zinc Primer ## Compatible Topcoats Full range of Rainbow topcoats, chlorinated rubber finishes, ULI topcoats ## Storage Stability: Minimum 3 years under normal storage ## Application Methods Brush Coating, Airless Spray, Roller Coating ### Airless Spray Parameters - Nozzle size: Graco 319 / 719 - Spray distance: 30~50cm - Air pressure: 3~5 kg/cm² - Pressure ratio: Min. 33:1 ## Construction Precautions ⚠️ 1. Mix base and hardener evenly per specified ratio, let stand 10~20 minutes for reaction before use. 2. Fully remove moisture, grease, sludge, rust and corrosive salts from substrate surfaces to guarantee protective performance. 3. Avoid construction when temperature below 10°C, raining or relative humidity exceeds 85%RH; fully dry damp surfaces before coating. 4. Clean all tools thoroughly after use. 5. Provide adequate ventilation during tank interior construction. ## Note All datasheet data are internal laboratory test results for construction reference only. Actual performance varies subject to different service environments. This document does not constitute any legally binding warranty or statement from the manufacturer. Contact our technical department for clarification of any uncertainties.