# EPOXY ZINC PHOSPHATE PRIMER
RAINBOW PAINTS
## Product Code
No.1076 (EP-66)
## Type
Two-component heavy-duty anti-corrosion primer formulated with epoxy resin, hardener and zinc phosphate anti-rust pigments.
## Application
Heavy anti-corrosion primer for steel structures in electronics factories, biochemical plants, bridges, chemical plants, waterfront facilities and external storage tanks.
## Properties
1. Excellent fresh water and seawater resistance
2. Outstanding rust prevention performance
3. Tough, flexible film with strong adhesion
4. Superior abrasion resistance
5. Excellent resistance to oil, solvents and chemicals
## Specification Data
- Gloss: Flat
- Color: Brown, Grey
- Flash Point: Above 20°C (68°F)
- Specific Gravity: ≥1.35 kg/L (mixed paint)
- Viscosity: 70~80 KU (25°C)
- Drying Time
- Surface dry: Within 1 hour (25°C)
- Hard dry: Within 6 hours (25°C)
- Full cure: 7 days
- Film Thickness: Wet film 100~220 μm, Dry film 40~100 μm
- Theoretical Coverage: 4.6 m²/L, 3.4 m²/kg (@100μm DFT)
- Recoating Interval: Minimum 8 hours (25°C), no maximum recoating time limit
- Mix Ratio: Base : Hardener = 4.6 : 0.4 (or as printed on pail)
- Volume Solids: 53% (mixed paint)
- Pot Life: 8 hours at 25°C
- Thinner: No.1005 Rainbow Thinner
- Thinner Dosage: 5~10% (by weight, excluding tool cleaning)
## Compatible Primers
No.908 Rust Preventive Primer (SP-01), No.1021 Inorganic Zinc Shop Primer, No.1011 Inorganic Zinc Primer
## Compatible Topcoats
Rainbow full series topcoats, polyurethane finish, chlorinated rubber coatings, fire retardant paints FM-900 / FM-1000 / FM-2000
## Storage Stability: Minimum 3 years under normal storage
## Application Methods
Brush Coating, Airless Spray, Roller Coating
### Airless Spray Parameters
- Nozzle size: 0.017"~0.021"
- Air pressure: 5~6 kg/cm²
- Pressure ratio: ≥33:1
## Construction Precautions ⚠️
1. Mix base and hardener evenly per specified ratio, stand 10~20 minutes for reaction before use.
2. Fully remove moisture, grease, sludge, rust and corrosive salts from substrate surfaces.
3. Avoid construction when temperature below 10°C, raining or relative humidity exceeds 85%RH; fully dry damp surfaces before coating.
4. Clean all coating tools immediately after use.
5. Maintain full ventilation during confined tank interior construction.
## Note
All datasheet data are internal laboratory test results for construction reference only. Actual performance varies subject to different service environments. This document does not constitute legally binding manufacturer warranty or statement. Contact Rainbow technical department for any inquiries.