# EPOXY FLOORING COATING
RAINBOW PAINTS
## Product Code
No.1001FL
## Type
Two-component thin-film epoxy topcoat, refined with epoxy resin, special hardener, weather-resistant and chemical-resistant pigments.
## Application
Floor coating for laboratories, food factories, hospitals, wastewater treatment plants, parking lots, warehouses, shopping malls and other buildings.
## Properties
1. Multiple color options, delivers neat and clean aesthetic effect
2. High volume solids, low VOC
3. Excellent abrasion resistance
4. Strong adhesion, no cracking or peeling
5. Fast construction & easy maintenance
## Specification Data
- Gloss: High Gloss
- Color: Full range of colors
- Covering Power: ≥8.0 ㎡/L (mixed paint, varies by color)
- Specific Gravity: ≥1.40 (mixed paint, varies by color)
- Viscosity: 75~85 KU (mixed paint, 25°C)
- Drying Time:
- Tack-free: Within 4 hours
- Dry hard: Within 14 hours
- Full cure: 7 days (25°C)
- Film Thickness: Wet film 125 μm, Dry film 100 μm (varies by color)
- Theoretical Coverage: 8 ㎡/L, 5.4 ㎡/kg
- Recoating Interval: Min. 8 hours, Max. 5 days (25°C) / Max. 3 days (30°C)
- Mix Ratio: As marked on each bucket
- Volume Solids: ≥75% (mixed paint, varies by color)
- Pot Life: 2 hours (mixed paint at 25°C)
- Heat Resistance: Continuous 93°C, Intermittent 121°C
- Thinner: No.1005 Rainbow Special Thinner
- Thinner Dosage: 0~5% (excluding tool cleaning)
- Compatible Primer: Rainbow series primers (construct in accordance with official designated procedures)
- Storage Stability: Minimum 3 years under normal storage
## Application Methods
Brush Coating, Airless Spray, Roller Coating
## Construction Precautions ⚠️
1. Mix base and hardener fully in specified ratio before use.
2. Remove all moisture, grease, sludge, dust, corrosive salts and other contaminants from substrate surface thoroughly.
3. Avoid construction when temperature below 10°C, raining, or relative humidity over 85%RH. Ensure full surface dryness for damp substrates.
4. Clean all coating equipment immediately after use.
5. Maintain sufficient ventilation during construction in enclosed spaces.
6. Sand the floor surface if recoating interval exceeds specified time to boost adhesion.
7. Long-term sunlight exposure may cause chalking on film surface, which will not affect coating performance.
8. Recommended recoating interval: wait at least 12 hours after finishing primer, intermediate coat and topcoat before applying next layer.
9. Personnel can walk on floor after 48 hours curing; vehicle traffic is permitted after full 7-day curing.
## Note
All data provided in this product datasheet are derived from internal laboratory tests for construction design reference only. Actual performance may vary subject to different construction environments. This document does not constitute any legally binding warranty or statement from the manufacturer. Please contact our technical department for clarification if any uncertainty exists.