# EPOXY ANTI-STATIC COATING
RAINBOW PAINTS
## Product Code
NO.1015AS
## Type
Two-component solvent-free conductive topcoat formulated with special solvent-free epoxy resin, hardener and conductive pigments.
## Application
Floor coating for electronic tech factories, wafer processing plants, cleanrooms, laboratories, hospital biotech zones, precision instrument rooms, computer rooms, powder processing plants, textile mills, solvent storage warehouses, ammunition depots and other areas.
## Properties
1. Tough coating film with excellent adhesion
2. Outstanding water and oil resistance
3. Single coat achieves dry film thickness over 200 μm
4. Excellent chemical and corrosion resistance
5. Surface resistance of coating system: 10⁴ ~ 10⁶ Ω
## Specification Data
- Gloss: Above 85%
- Color: Limited range (refer to color card)
- Covering Power: ≥8 ㎡/L (mixed paint)
- Specific Gravity: ≥1.3 Kg/L (mixed paint)
- Viscosity: 100~120 Ku (mixed paint, 25°C)
- Drying Time:
- Tack-free: Within 6 hours
- Hard dry: Within 18 hours
- Full cure: 7 days (25°C)
- Dry Film Thickness: 0.8 mm
- Theoretical Coverage: 1.0 Kg/㎡ @ 0.8 mm dry film
- Recoating Interval: Min. 24 hours, Max. 2 days (25°C)
- Mix Ratio: Base : Hardener = 4 : 1 (by weight)
- Non-Volatile Content: Above 95% (mixed paint)
- Pot Life: 0.5 hour (mixed paint at 25°C)
- Thinner: No.1005 Rainbow Thinner (SP-12) (only for tool cleaning)
- Compatible Primers:
No.1073 Transparent Cement Primer, No.1098W Conductive Primer
(Construct per official designated procedures)
- Storage Stability: Minimum 1 year under normal storage
## Application Methods
Self-leveling pouring, Brush coating (for small-area touch-up only)
## Construction Precautions ⚠️
1. Mix base and hardener uniformly in specified ratio prior to use.
2. Thoroughly remove all surface contaminants including moisture, grease, sludge and dust from substrates.
3. Avoid construction on rainy days or when ambient relative humidity exceeds 85%RH. Ensure full surface dryness for damp substrates.
4. Clean all coating equipment immediately after use.
5. If applied directly on cement substrates, wait until the surface is fully dry before construction.
6. Sand the coating surface if recoating interval exceeds specified time to guarantee interlayer adhesion.